Specialize Instruction

Current Position > Home > Specialize Instruction

Bleeding air

Release time:2015-04-21

The hydraulic system is designed to bleeding air by loosing the bleeding plug. Lifting the carriages to about 1 meter height, and loose the bleeding plug, the air would be bled automatically, then tighten the plug after bleeding, the lift would work stably and smoothly, otherwise repeat bleeding

Back
prev: SX07 Operation Instruction
next: Adjust the lower speed